Grid intensity moves by 87% across a day. For an aeroponic nursery, the schedule of the fog pump is a bigger lever than the efficiency of the pump.
Every footprint calculation multiplies kilowatt-hours by a grid factor. Almost every calculation uses an annual average. That single choice hides the largest controllable variable in the whole system.
On a grid with a large solar share, the marginal intensity at 2am is roughly a third of what it is at 6pm. A nursery that irrigates at night and one that irrigates in the evening can have identical equipment and identical consumption, and footprints that differ by 20% or more.
| Period | kgCO₂e / kWh | What is on the margin |
|---|---|---|
| 00–06 | 0.31 | Baseload: nuclear, hydro, coal |
| 06–09 | 0.38 | Ramp-up, gas peaking |
| 09–17 | 0.45 | Solar at peak, gas balancing |
| 17–21 | 0.58 | Evening peak, gas and imports |
| 21–24 | 0.41 | Wind and hydro returning |
Those numbers are illustrative but the shape is real. The evening peak is where the carbon is, and the evening peak is usually when lighting, pumping and cooling all run at once.
Because they are free. An annual figure comes with the bill; an hourly figure requires either hourly metering or a published marginal-intensity series joined to your load profile. Most sustainability teams do not have the second thing, so they use the first.
Grade A needs 15-minute intervals for twelve months. Grade B needs hourly. Below that the answer is a daily or monthly shape, and the reported uncertainty widens accordingly — we state the interval in the statement rather than pretending the precision is uniform.
If the schedule is the biggest lever, then a farm can cut its footprint without buying anything. That is good for the farm and awkward for anyone selling efficiency hardware — which is one reason hourly data is not yet standard: the people paying for the measurement rarely want the answer it produces.
We verify what the meter says. If the honest answer is that the equipment was fine and the schedule was not, the statement says so.
This note describes our method and commercial position. It is not a verification statement and carries no assurance. Under the two-track plan the certification conclusion is signed by a licensed partner; this site issues the method, the evidence grades and the register.